How much time can you wait in between the first coat of finish,then applying the decal and the application of the second coat of finish. I am using ThreadMaster Lite formula, two part resin and hardener. Re: Decal Application and second coat of finish
Posted by:
Tom Kirkman
(Moderator)
Date: November 20, 2017 11:42AM
As long as the first application is set well enough that you don't damage/upset it, you can apply a second any time after that. If you're working with a water based decal, I would probably get the first application a full day's time to set before applying the decal.
............. Re: Decal Application and second coat of finish
Posted by:
David DeBruhl
(---.dhcp.gnvl.sc.charter.com)
Date: November 20, 2017 05:14PM
Thanks Tom.That worked. I knew I needed to let it set but wasn't sure if I could wait that long and still apply another coat. I had been using another brand and from the directions with that brand read to apply second coat within 6-10 hours and that finish I knew would still be tacky. This is the first blank where I needed to apply finish and then apply the blank. The previous builds I was able to apply the decal straight to the blank and then apply the finish. Re: Decal Application and second coat of finish
Posted by:
Lynn Behler
(---.97.252.156.res-cmts.leh.ptd.net)
Date: November 21, 2017 06:17PM
I was about to ask a stupid question, sorry. Edited 1 time(s). Last edit at 11/21/2017 06:20PM by Lynn Behler. Re: Decal Application and second coat of finish
Posted by:
darrel odland
(---.lightspeed.frokca.sbcglobal.net)
Date: November 26, 2017 07:13PM
David, Just finished a build using fingernail art decals (sports teams) I recommend a full day of drying before any epoxy is applied. The build was Awesome. Very well received!!